INTERACTIVETurn on V2B to compare schedules

What Does V2B Add to Managed Charging?

In both schedules, the 60 kWh EV plugs in at 09:00 with 20% and leaves at 20:00 with 80%.

Managed charging Add the vehicle-to-building schedule as a dashed line alongside managed charging.
Building grid draw and EV battery chargeBoth plots share a time axis from 09:00 to 21:00. Grid draw is the building’s average net import during each 15-minute interval. Battery charge is shown at the start of each interval and at departure at 20:00. Shading marks 17:00 to 19:00, when the EV supplies the building under V2B. Managed charging is solid blue. Enable V2B to add a dashed green line.Power drawn from the grid (kW)17:00–19:00EV battery charge (%)80% at departure · 20:000204060050100Off siteTime09:0012:0015:0018:0021:00 Use the arrow keys for 15-minute steps. Home and End select 09:00 and 21:00. The table below shows the selected values.
Strategy at EV activityGrid drawGridBattery
ManagedPlugged in and waiting54.0 kW80%

The EV waits at 80% charge. The building draws 54.0 kW from the grid.